A1: Cardio zones: 8–12 mm EPDM rolls (absorb ≥90% footfall shock without equipment wobble); Light weight zones: 15–25 mm interlocking tiles (cushions 10–20 kg dumbbells); Heavy Olympic lifting: 30–50 mm high-density SBR tiles (withstands 20 kg+ barbells dropped from 1.8 m, reducing noise >70%); Home gyms: 15–20 mm tiles.
A2: Tile weight is 1.8 kg/m ² per 1 mm thickness (10 mm ≈ 18 kg/m ², 20 mm ≈ 36 kg/m ², 30 mm ≈ 54 kg/m ², 50 mm ≈ 90 kg/m ²). Residential slabs (capacity ≤200 kg/m ²): use 8–20 mm (deadweight ≤40 kg/m ²); Commercial slabs (200–350 kg/m ²): use 15–30 mm; Heavy slabs (≥350 kg/m ²): use 30–50 mm. A 1.8 m barbell drop creates dynamic loads 3–5 times static weight; reserve ≥30% slab margin.
A3: Thickness check: Measured deviation must not exceed ±5% (e.g., a nominal 50 mm tile must measure ≥ 47.5 mm). Shock test: 12 mm tiles must achieve ≥ 90% footfall shock absorption (peak force ≤ 680 N). Compression set: Under 100 kg static load for 24 hours, residual indentation must be ≤ 10% (e.g., ≤ 5 mm on a 50 mm tile).
A4: Evaluated under a 2-meter straightedge: 3–12 mm acoustic underlays/rolls require gap ≤ 2 mm; 15–20 mm commercial tiles require gap ≤ 3 mm; 25–40 mm gym tiles require gap ≤ 4 mm; 50–100 mm heavy lifting tiles require gap ≤ 5 mm. Concrete must be ≥ C20 compressive strength, moisture content ≤ 3%, with zero dusting or hollows.
A5: Randomly select ≥ 10 test points per 100 m² (prioritizing doorways, corners, and equipment footings). Place a 2-meter aluminum straightedge across horizontal, vertical, and diagonal directions. Insert a tapered feeler gauge into the maximum gap between straightedge and slab; the reading indicates flatness deviation.
A6: Reducer transition ramps are available in at least 9 standard colors (plus full custom color matching) to match tile colors. Ramps are molded from the identical raw material formulation as the matching tile batch, ensuring identical aging rates and operational lifespan.
A7: Replacement takes 10 to 15 minutes per tile depending on installation method: Interlocking / Loose-laid tiles take under 10 minutes (pry damaged tile, sweep dust, drop in new tile; immediate use); Spot-glued tiles take ~15 minutes (walkable in 2 hours); Full-spread glued tiles take 20–25 minutes (heat gun softening, glue scraping, re-gluing; 24h full cure).
A8: Demolition: Floor scraper / wide-blade chisel, SDS-plus rotary hammer with wide chisel (for full-spread glue), heavy pry bar (for interlocking tabs), industrial vacuum. Installation: Tape measure, steel ruler (≥1m), chalk line marker, heavy utility knife (tiles ≤15mm), fine-tooth jigsaw (tiles >15mm), rubber mallet, tapping block, 3mm V-notch trowel, 50–100 kg roller, knee pads, dust mask, solvent cleaner.
A9: 1. Pre-conditioning: Acclimatize new tiles on site for 24h (stacked ≤3 tiers high). 2. Demolition: Pry up damaged tile from edges without gouging substrate. 3. Subfloor prep: Scrape hardened residual glue flat, vacuum dust, clean with solvent. 4. Dry-fit alignment: Snap chalk line, maintain 10 mm perimeter expansion gap, pre-cut tiles. 5. Installation: Interlock tabs with rubber mallet, or apply PU adhesive and compress with 50 kg roller.
A10: Visual: Dense surface cracking, large-scale peeling/delamination, or exposed base carcass. Mechanical: Shore A hardness shift exceeding ±10 points (brittleness), or tile thickness wear exceeding 15% (cushioning loss). Safety: Hollow debonding, buckling, or loss of wet traction (slip hazard). Economic: More than 3 adjacent broken tiles (full section replacement recommended).
A11: Environment: Temperature must be 15–30°C, RH ≤ 75% (strictly prohibited below 5°C or in rainy humid conditions). Acclimatization: Relax tiles for 24 hours. Expansion gaps: Maintain 8–10 mm at walls and add expansion breaks every 8 m across large halls. Adhesive: Use rubber-specific PU adhesive (PVC glue prohibited). Curing: Zero foot traffic for 24 hours; zero heavy weight drops for 72 hours.
A12: No. For interlocking tiles, cut perimeter seams with a utility knife and lift vertically to avoid pulling neighbor tabs. For glued tiles, cut along boundary seams, scrape glue only within the local repair footprint, and roll new tile flat. Surrounding bonded tiles remain undisturbed and structurally stable.
A13: 1. Heat testing: Run heating system continuously for 72 hours up to max design temp (≤55°C) to expel slab moisture; cool to 18–25°C before laying. 2. Moisture check: Concrete moisture must be ≤ 2.5% (tested by carbide hygrometer). 3. Tile acclimatization: Relax tiles on site for 48 hours at 18–25°C. 4. Adhesive: Use heat-resistant PU adhesive rated ≥ 60°C. 5. Commissioning: Wait 24h after install before turning on heat; raise temp gradually by ≤ 5°C per day.
A14: Yes. Permitted if existing subfloor is structurally solid, flat, and dry. Old ceramic tiles: Hollow rate must be ≤ 5%, tile joints patched flush. Old wood: Fasten loose boards, sand smooth (equivalent to C20). Old concrete: Compressive strength ≥ C20, flatness gap ≤ 3 mm/2 m. Degrease thoroughly, roll penetrating primer, acclimatize tiles for 48h, and glue down with 50 kg roller or use interlocking tiles.
A15: Yes. Use high-impact rubber with minimum thickness ≥ 10 mm (thin rolls under 6 mm are prohibited under spin bikes). Ensure 100% concrete flatness and full-spread glue down to disperse weight; dense 8 mm+ vulcanized rubber absorbs high-frequency vibrations from flywheel torque without denting or tearing.
We believe customers should clearly understand what they are purchasing, what specification they are receiving, and what service they can expect.
Our goal is not simply to offer the lowest initial price, but to create greater long-term value for our customers.
We treat customer feedback as an important source of information for improving products, services, and internal processes.
For SOL RUBBER, cooperation is not about one or two purchase orders. It is about building a relationship that can grow over many years.
When customers choose SOL RUBBER, they choose a supplier that is prepared to stand behind the products it delivers. SOL RUBBER Company Profile EN
We focus on providing stable and reliable quality rather than simply producing the lowest-cost product.
Our quality management covers the key stages from raw-material selection and manufacturing through inspection and packaging.
Quality control is integrated into our production process rather than being treated as something that happens only at the end.
We continuously review production and customer feedback to improve product consistency and performance.
We invest in R&D and product development to respond to changing market requirements.
Official Website: https://www.solrubber.com
NO 11,ZAOYUAN ROAD,QINGDAO,CHINA
Postal Code:266121
+86-532-8886 5499
+86-532-8791 0991